← Catalog

Cyan Eclipse BidMatrix MCP

Drop in a solicitation, get back the compliance matrix — Section L/M extraction, requirements checklist, deadlines, set-aside summary.

In developmentMCP serverCERTIFIED(local)Government Contracting Document Analysis

Vendor: Cyan Eclipse Technologies · Platforms: MCP over stdio (HTTP transport on roadmap)

Certification scope

CERTIFIED(local) — Eclipse Bazaar Test Bench 2026-10-26, 25 pass, 1 na of 26 checks (U1 auth: stdio process boundary). Run by W-003 (Verity), suites/bidmatrix.py. Runs 1–2 FAILED and the run-3 harness flake are retained append-only; run 4 is the standing card — defects D1–D6 fixed and verified on bench-built fixtures independent of the builder's tests. N-CHECK: NOVELTY_PROVEN — evidence-bound rows (every requirement a verbatim substring of the source with a section + line locator) plus the SILENT_EMPTY completeness pass; with D4 fixed, the completeness limb holds under repeated section ids.

What it does

Tools

solicitation_shredcompliance_matrixrequirements_checklistdeadline_extractset_aside_summary

Problems it addresses

Not tested

Bench scorecard: test-bench/results/eclipse-bidmatrix-mcp-2026-10-26-4.json

Evaluation-intake listing

This listing records the tool's place in the Bazaar's evaluation and monitoring pipeline, with the evidence gathered so far printed above — verdict, scope, and not-tested items included. It is not sold on this site, and its presence in the catalog is not a claim beyond that evidence. The service behind every verdict is the bench: what a bench run buys →